Infenion Batam – Indonesia

Scope of work

1. 2" Vacuum-Jacketed (VJ) Rigid Pipe, R20P – 100 meters
2. 2" Vacuum-Jacketed (VJ) Pipe, R10T – 130 meters
3. 0.5" Droppers with Double Isolation Valves, R5T – 26 units
4. Pressure Adjustable Phase Separators, C48P – 4 units
5. Inline Degassers – 4 units
6. Electronic Cryovents – 5 units
7. Mechanical Cryovent – 1 unit
8. 1" SemiFlex Flexible Hose, SF25 – 180 meters
9. Lateral Pressure & Temperature Sensors – For all lateral lines
10. Oxygen (O₂) Monitoring System – 1 set

Featured Images

  Infenion Batam 1

 

Infenion Batam 2

 

Infenion Batam 3

 

Infenion Batam 4

 

Infenion Batam 5

 

Infenion Batam 5

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System

Working Process

01
Step

Design and Planning

All the Lorem Ipsum generators on the Internet tend to repeat predefined.
02
Step

Component Sourcing

Ority have suffered alteration in some randomised words which don't look.
03
Step

Testing and Quality

All the Lorem Ipsum generators on the Internet tend to repeat predefined.
04
Step

Final Assembly

Handful model sentence structures generate which looks reasonable.

Project Information

Client Name

Infenion Batam - Indonesia

Category

Semiconductor

Duration

7 months

End Time

July - 2025

Budget

$136.000.000

Location

Batam (Indonesia)

Have a
project in
mind?