Micron Taiwan

Micron Taiwan

Scope of work

1. 2" Vacuum-Jacketed (VJ) Rigid Pipe, R20P – 330 meters
2. 1" Vacuum-Jacketed (VJ) Pipe, R10T – 650 meters
3. 0.5" Droppers with Double Isolation Valves, R5T – 135 units
4. Point-of-Use (POU) Flexible Hose, UF8 – 7 meters × 135 lengths
5. Pressure Adjustable Phase Separator, C76P – 2 units
6. Electronic Cryovents with Liquid Level Indicator – 11 units
7. Inline Degassers, 10L – 15 units
8. DV6R Components – 530 units
9. 2" Manual Valves (for R20P Main Header) – 16 units
10. 1" Manual Valves (for R10T Sublaterals) – 32 units

Featured Images

  

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System

Working Process

01
Step

Design and Planning

All the Lorem Ipsum generators on the Internet tend to repeat predefined.
02
Step

Component Sourcing

Ority have suffered alteration in some randomised words which don't look.
03
Step

Testing and Quality

All the Lorem Ipsum generators on the Internet tend to repeat predefined.
04
Step

Final Assembly

Handful model sentence structures generate which looks reasonable.

Project Information

Client Name

Micron Taiwan

Category

Semiconductor

Duration

10 months

End Time

July - 2025

Budget

$136.000.000

Location

Taichung (Taiwan)

Have a
project in
mind?